| Client: |
BAT - British American Tobbaco |
| Location: |
Ibadan, Nigeria |
| Construction period: |
2001 - 2003 |
Cigarette Factory Project done for British American Tobacco,
one of the World leading Companies in Tobacco Industry.
Area 22000m2.
The Project consists of highest standard special customized
MEP systems for this type of industrial buildings and includes
detailed design, procurement, installation, testing and commissioning,
training, as built documentation, operation &
maintenance manuals, defect liability period.
MECHANICAL SERVICES:
HVAC:
Central A/C systems with 3 chillers with screw compressors, Air Handling
Units, DX package Units, Fan Coil Units, Ventilation.
Fire Protection:
Sprinkler, Hydrant, Standpipe, Hose reels, Inergen (IG100), Foam
Deluge:
Plumbing:
Water Treatment Plant, Water Supply, Waste Water Treatment Plant,
Sewerage System, Drainage, Irrigation System
Technology installations:
Steam plant, Liquid Petroleum Gas Plant, Vacuum Plant, Compressed Air
Plant, Fuel Oil Supply Plant, Fuel oil Supply Yard
ELECTRICAL SERVICES:
Telecommunication:
Telephony System, Data Network, Fire Detection, Burglar Alarm, Access
Control,CCTV, Public Address and Voice Alarm System
Electrical:
HV Equipment, LV Equipment, Power Installation, Lighting, Lightning and
Earthing Protection, MCC&MCP
BMS&EMCS:
Building Management System, Electrical Monitoring & Control System
|