| Transmission Line & Substation Egbin
|
| Client: |
NEPA |
| Location: |
Lagos, Nigeria |
| Construction period: |
2003 - |
Design, procurement, construction & commissioning of 330kV D/C
Transmission Line, 28km long, conductor type – twin bundle ACSR
“BISON”, steel lattice towers, average span 400m. Design, procurement, construction & commissioning of 2 additional line
bays in 330/132kV substation at Egbin. |

|
| New
Supply system of Clinical Center of Serbia - lot 1 – central
boiler and auxiliary boiler plant
|
| Client: |
Ministry of Health and
Clinical center of Serbia |
| Location: |
Belgrade, Serbia |
| Construction period: |
2006 - |
The contract consists of design, supply,
build and two years long maintenance period of central and
auxiliary boiler plant.
Central boiler plant - 1CHP (combined heat and power plant
1,8MWe and 1,8MWt), 3 hot water boilers 40MW, district heating
pump station, central steam boilers 6t/h, central monitoring
system CMS.
Auxiliary boiler plant - 2 steam boilers (2x2,5t/h) and CMS.
|
 |
| Substation Katampe
|
| Client: |
NEPA |
| Location: |
Lagos, Nigeria |
| Construction period: |
2000 - 2003 |
Design, procurement, construction & commissioning of substation,
330/132/33kV, 2x150 MVA, 2x60 MVA and connection to the new 330kV
and existing 132 kV S/C transmission lines. The construction of residential
houses for operational and maintenance staff is also a part of this
project. |

|
| Substation Central Area (GIS)
|
| Client: |
NEPA |
| Location: |
Abuja, Nigeria |
| Construction period: |
2000 - 2004 |
Design, procurement, construction & commissioning of GIS substation,
132/33kV, 2x60 MVA. The construction of residential houses for operational
and maintenance staff is also a part of this project. |

|
| Substation UYO
|
| Client: |
NEPA |
| Location: |
Akwa Ibom State |
| Construction period: |
1995 - 1997 |
As the main contractor, Energo has successfully completed project
of the Sub Station Uyo on the Turn Key basis.
The project has been completed within the contract period and the
budget price. Standards of Nepa were applied and the Station is
operating effi ciently up today.
132/33kV, 2 x 30 / 40 MVA transformer station connected to the existing
132kV S/C Transmission Line, with all necessary equipment, connections
and control building. The construction three best Residential houses for the
Client’s operation and maintenance staff were also part of this project. |

|
| Substation Ilesha
|
| Client: |
NEPA |
| Location: |
Ilesha - Osum State, Nigeria |
| Construction period: |
1996 - 1999 |
As an experienced and reputable company of competing similar
Turn–Key projects in Nigeria and world wide, Energo executed as
the subcontractor of ABB the following works: design, erection and
commissioning of the Ilesha Substation.
Standard NEPA Substation, 132/33kV, 2 x 30 / 40 MVA and connection to
the existing 132 kV S/C transmission line. The construction of residential
houses for operational and maintenance staff as well as staff training
were part of the project. |

|
| Transmission Line Shiroro - Abuja
|
| Client: |
ABB |
| Location: |
Shiroro - Abuja |
| Construction period: |
2000 - 2003 |
Construction of 330kV D/C Transmission Line, 150km long, conductor type
– twin bundle ACSR “BISON”, steel lattice towers, average span 400m. |

|
| Transmission Line Aliade Makurdi
|
| Client: |
NEPA |
| Location: |
Benue State |
| Construction period: |
1993 - 1999 |
330kV S/C Transmission Line, 46km long, conductors type ACSR “Bison”
350 mm2 two per phase, earth–wire conductor GSW 2x140mm2. Steel
lattice self supported structure. Average span is 400m. |

|
| Replacement of distant protection relays
|
| Client: |
NEPA |
| Location: |
All over Nigeria |
| Construction period: |
2003 - 2005 |
Design, procurement & construction of distance protection relays on 11
power plants – substations all over Nigeria. |

|
| Lagos Distribution System Expansion LDSE
|
| Client: |
NEPA |
| Location: |
Lagos |
| Construction period: |
1986 - 1992 |
The project LDSE represents one of the most sophisticated
expansion project of the network at different voltage levels.
As such it takes an outstanding place among the ones executed
by Energo in the past.
132kV D/C Transmission Line–99km, and 33kV D/C Transmission Line–
50km, 23 lines spreading through the city of Lagos area and its outskirts,
488 steel lattice towers for 132kV and 516 tubular steel poles for
132kV and 33kV.Phase conductors–ACSR “Bear”, protection cable steel
58mm2, glass cap insulators and long porcelain insulators with safety
clamps. |

|
| Transmission Line Aja Lekki
|
| Client: |
NEPA |
| Location: |
Lagos |
| Construction period: |
1986 - 1992 |
Energo executed on the Turn–Key basis, the construction of
the transmission line with the following characteristics:
33kV D/C Transmission Line, 20km long, conductor type – ACSR “Bear”,
steel lattice towers and steel poles, average span 100m. |

|
| Erection of Repetitor Stations, Towers for Solar Panels and Antennas for Microwave Communication Links
|
| Client: |
NITEL/SIEMENS & NEPA/SIEMENS |
| Location: |
Jos-Makurdi, Kaduna-Kano, Abuja-Kaduna-Bautchi,
Kuta-Shiroro |
| Construction period: |
1997 - 1999 |
In order to upgrade, modernize and digitalize the existing
power supply of telecommunication network with solar
panels, Energo, as the subcontractor of Nitel–Siemens, has
performed: design, civil works on control buildings, supply,
maintenance work on refurbishment of the existing exchange
network, erection installation and erection of new towers with
antennas and solar panels on the digital microwave links.In
1999, Enego erected 3 new towers on the digital microwave
link Kuta–Shiroro.
Project characteristics:
Refurbishment and erection of new towers with antennas 50–80m high,
erection of new towers–15 and 60m high on the digital microwave link. |

|
|
|